A major milestone has taken place beginning August, Gonvarri has deployed the dish structure that supports the mirrors and the Stirling engine. The high temperatures were an added challenge to a R&D Project but the assembly was smooth and the tracking was tested properly.

The structure was deployed by TECSOL www.tecsol.eu.com. See video on YouTube https://youtu.be/rSMNvUprLbc

Next step is the mirrors assembly by ToughTrough to be deployed very soon.

Enjoy the pictures.

Structure III

Structure I

Structure II

Structure IV